• About Us
  • Projects
  • Services
  • Research and Technology
Go
  • New Buildings
  • Existing Buildings
  • Repair and Rehabilitation
  • Construction Management
    • 730 Grant Avenue
    • Admiral Point
    • Claridges
    • Governor's Tower & Villas
    • La Mirage
    • Lakeside Terrace
    • Mariner's Landing
    • Pacific Point
    • Sheraton Guildford Hotel
    • Space Building
    • The Manhattan
    • The Metropolitan
  • Architecture
  • Building Asset Management
  • Litigation Support
  • Special Use Buildings
  • Sustainability
  • Risk Assessment
  • Research and Development
Claridges
Client:
Strata Plan LMS 4034
2008
  • Number of Suites: 166
  • Number of Storeys: 31
  • Use/Occupancy: Residential
  • Comprehensive enclosure rehabilitation of top three storeys at penthouse level and targeted repair at lower levels. Brick and stucco upgrades and full window replacements on upper levels.
  • Suspended scaffold system at three upper levels with access tower and hoist from ground level. Lower level targeted repairs completed from swing stage.
  • Rout, caulk, and paint exposed concrete walls.
  • Deck renewals on all levels.
  • High performance window and door replacement at upper levels—improved detailing at lower levels.
  • Replacement of brick veneer and stucco at upper levels.
  • Metal roof renewal at main roof.
  • Condition assessment
  • Design
  • Construction documents
  • Tendering
  • Construction management
  • Field review
  • Litigation support
  • Maintenance and renewals plan

Marcus Dell

Kevin Ganzert

Michael Roche

John Da Silva

Matt Mulleray

Ed Thiessen
  • Claridges [PDF] - 104KB
  • Career Opportunities
  • Client Login
  • Sitemap
  • Contact Us
  • Vancouver BC
  • Victoria BC
  • Portland OR
  • Seattle WA
  • Courtney BC
  • Ion Branding and Design
  • Powered by Smallbox CMS
  • RDH is Different
  • Our Team
  • Career Opportunities
  • News
  • Contact Us
  • New Buildings
  • Existing Buildings
  • Repair and Rehabilitation
  • Construction Management
  • Architecture
  • Building Asset Management
  • Litigation Support
  • Special Use Buildings
  • Sustainability
  • Risk Assessment
  • Research and Development
  • New Buildings
  • Existing Buildings
  • Repair and Rehabilitation
  • Construction Management
  • Architecture
  • Building Asset Management
  • Litigation Support
  • Special Use Buildings
  • Sustainability
  • Risk Assessment
  • Research and Development
  • Building Enclosure Components
  • Internal Research Projects
  • Publications
  • Articles and Papers
  • Building Science Toolbox
  • Current Research Projects
  • 4-D Build Details
  • Presentations